Leister Canada
  • Home
  • Equipment
    • All Equipment >
      • Air Heaters
      • Automatic Equipment
      • Blowers
      • Extrusion Welders
      • Hot Air Blowers
      • Hot Air Hand Tools
      • Testing Equipment
    • Flooring
    • Geomembrane
    • Industrial Fabrics
    • Manufacturing
    • Plastic Fabrication
    • Roofing & Decking
  • Services
    • Product Selection Help
    • Design Services
    • Installation Support
    • Product Training
    • Product Service
  • Resources
    • Articles
    • Case Studies
    • System Design Calculations
    • Operating Manuals
    • Tech Tips
    • Whitepapers
  • About Us
  • Contact
    • Contact Us
    • Find a Distributor
  • Français

UNIFLOOR Tech Tips

12/1/2016

 
Symptom: Bad welds or low air volume 
  • Check that the air intake at the blower handle is clear of dust and debris. Clean it with a soft brush to remove any blockage.
  • Check the air slide at the air intake. Turn it clockwise for more heat or counter-clockwise for more air volume.
UNIFLOOR Wiring Instructions - 120V tool only
Plug specifications: 125V; 15A; 2-pole; grounded; male
Connecting a plug:
  • Connect the green wire to the ground pin
  • Connect the white wire to either remaining pin
  • Connect the black wire to the last pin

When making an extension cord for your UNIFLOOR use a 10 Gauge or thicker cable if you plan to make a 100 ft or longer extension cord.

Generator Instructions:
  • Starting procedure:
    1. Switch on the generator
    2. Switch on the UNIFLOOR
  • Shut-down procedure:
    1. Switch off the UNIFLOOR
    2. Switch off the generator

Comments are closed.
STANMECH Technologies Inc. 
944 Zelco Drive Burlington ON L7L 4Y3 | 1-888-438-6324 | 
[email protected]
Terms of Use    Privacy    Terms and Conditions of Sale   Warranty Policy
Français

Proud Member of:
Picture
International Association of Geosynthetic Installers
  • Home
  • Equipment
    • All Equipment >
      • Air Heaters
      • Automatic Equipment
      • Blowers
      • Extrusion Welders
      • Hot Air Blowers
      • Hot Air Hand Tools
      • Testing Equipment
    • Flooring
    • Geomembrane
    • Industrial Fabrics
    • Manufacturing
    • Plastic Fabrication
    • Roofing & Decking
  • Services
    • Product Selection Help
    • Design Services
    • Installation Support
    • Product Training
    • Product Service
  • Resources
    • Articles
    • Case Studies
    • System Design Calculations
    • Operating Manuals
    • Tech Tips
    • Whitepapers
  • About Us
  • Contact
    • Contact Us
    • Find a Distributor
  • Français